Manufacturing Project The project whose scope includes delivery through manufacturing will include some quality assurance steps from the previous blog post to ensure we are able to produce the designed product to the quality expected by the sponsor. Trial Production Run and Problem Discovery The manufacturing team reviews the development of the manufacturing line with […]

In our last blog post, we referred to the APQP  (Advanced Product Quality Planning) activity of DFMEA.  The post was about the attempt to perform late in a project.  The point to the DFMEA in that instance was lost; at best, if we found a serious problem, would be to abort the launch.  The post […]

Asking for more… Recently, I overheard a project manager discussing the use of a quality tool for their project. The project is well underway. Can you guess the tool under discussion?  It was the DFMEA or Design Failure Mode Effects Analysis.  There are a couple of things wrong with starting the discussion at this point, […]

The blog “Testers Do Not Break the Product” was posted on LinkedIn and there were considerable responses and exchanges.  In an effort to continue that same discourse, I post some of that exchange. Many thought the language “breaking”, as did many others, to be unclear or ambiguous. The language in this discussion originates from the […]

Conflict with “Pragmatic” Recently, on Twitter, I had to express my discontent with the word Pragmatic.  My spontaneous outburst so amazed me that I decided to explore this further.  The definition on dictionary.com[1] is: Of or about a practical point of view or practical considerations Philosophy of or about pragmatism Of or about pragmatics Treating […]

By Kim Robertson and Jon M. Quigley Leveraged Innovation Logistics Mike and Akio had been invited to one of the Genesis Test Equipment logistic repair depot by Lina Hendrik, the facility manager to discuss an idea she had regarding retrofit of a discontinued product line still widely used in an automotive niche market segment. As […]